Emerging Engineering Group M
Search This Blog
Labels
Afy
(11)
Appointments
(1)
assembly
(4)
Contractor email
(2)
Crane Hoist
(1)
Design
(10)
Dimensional analysis
(2)
Drawing
(8)
Group SWOT analysis
(1)
Hector
(6)
Hoists
(1)
I Beam Trolley
(1)
Ian Thomas
(21)
Jack design
(1)
James Woods
(32)
Job Titles
(1)
Juan Andres Vasquez
(37)
Lifting Straps
(1)
model
(10)
Planning meeting
(2)
Presentation
(1)
Project manager
(1)
Rendered Image
(1)
Sketches
(1)
Taks - for 15/3/10
(1)
Tender (1st Draft)
(1)
TimeScale
(2)
video
(2)
Monday 8 March 2010
is it working?
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2010
(90)
►
May
(1)
►
April
(55)
▼
March
(34)
Progression
Rendered view of the foot
Cut-away view of the foot
I Beam Trolley
I-Beam Drawing
Drawing of the leg
Bottle jack dimensions
Making steel components ...
3d Model of I-beam
I-beam dimensions sketch
Solidworks Sketch
I beam Dimensional analysis
Email to supplier
Bending Diagrams with x2 safety factor (in accorda...
Dimensions and calculations - I beam
Where were some thinking on how we could design th...
At this step we decided to reject the design of th...
Sliding Device
No title
Initial Design
Pictures from 17th March meeting
the picture above describes one of my ideas where ...
Available Hoists - Ian Thomas
lifting mechanism
Results of Group Meeting 15/3/10
What does 1000kg look like? Ian Thomas
Hydraulic Jacks. Ian Thomas
Materials
transportation of the crane
Tasks for next group meeting (15/3/10)
Group Composition
Timeline of events
is it working?
COntact details
Contributors
Ian Thomas
James Woods
Juan Andres Vasquez
afy