Monday, 8 March 2010

Tasks for next group meeting (15/3/10)

The following areas of responsibilty are to be researched by the nominated individual prior to the 2nd meeting:

James Woods
Exisitng Products (and costs).
Design construction and ease of use.

Hector Vela Garza
Enviornmental conditions (of the disaster area that the product is likely to operate within).

Juan Vasquez Amaya
Available materials and properties.

IanThomas
1000kgs - what shape and size can it take
Lifting Jack design

Aftab Thakur
What Transport would carry it.
What size is a 'standard' Land rover. How will this impact the product.

3 comments:

  1. Hey Guys is Juan here's a link that I found it might help you with each one of your tasks, it contains Design, Materials, Manufacturing Process, Quality Control, etc. Check it out:

    http://www.madehow.com/Volume-5/Crane.html

    ReplyDelete
  2. Here are some links to enviromental safety, misconceptions, crane control and accidents:

    Crane Enviromental Safety Factors
    http://intro2u.net/crane/crane_factors.htm

    Review of Crane Safety in Construction Business (PDF)
    http://depts.washington.edu/frcg/content/NeitzelCraneSafetyReview.pdf

    Six Dangerouns Misconceptions
    http://www.thefabricator.com/article/safety/six-dangerous-misconceptions-about-crane-safety

    All about Crane Accidents (statistics/victims/dates/etc)
    http://www.craneaccidents.com/

    I also found this blog which could be usefull.
    http://www.cranetalk.com/

    ReplyDelete
  3. Theres a link for some example of mobile cranes:

    http://www.mechancranes.co.uk/crane_products/mobile_cranes/

    ReplyDelete