As a result of the group meeting (1200hrs 15/3/10) the following areas of work were identified:
Material costs to be calculated - Juan and Afy
Existing Crane designs to be uploaded - James
Pully and lifting mechanisms to be investigated (after consultation with Doctor Thomson) - Ian and James
Presentation format and data collection - Hector
All are to produce outline designs for next group meeting (Wed 17/3/10). The most producible design will then be chosen for further production.